13.10.080 Service connection charges.
This section is included in your selections.
(1) Charges for new service connections shall be paid in advance and are as follows:
Meter Size |
Charge |
---|---|
0 – 3/4" |
$1,200 plus meter costs |
1 – 6" |
$2,500 plus meter costs |
(2) Connection rates for outside the city limits shall be double the above rates. (Ord. 343 §§ 1, 2, 1995; Ord. 289 § 1, 1985; Ord. 257 § 1, 1980; Ord. 250 § 1, 1979; Ord. 247 § 1, 1979; Ord. 239, 1978; Ord. 224 § 8, 1977).