Skip to main content
Loading…
This section is included in your selections.

(1) Charges for new service connections shall be paid in advance and are as follows:

Meter Size

Charge

0 – 3/4"

$1,200 plus meter costs

1 – 6"

$2,500 plus meter costs

(2) Connection rates for outside the city limits shall be double the above rates. (Ord. 343 §§ 1, 2, 1995; Ord. 289 § 1, 1985; Ord. 257 § 1, 1980; Ord. 250 § 1, 1979; Ord. 247 § 1, 1979; Ord. 239, 1978; Ord. 224 § 8, 1977).